Samahnzi installed Generic, 500MW, full-scope Combined Cycle Plant Simulator - July 20, 2010
Samahnzi installs our generic, 500MW, full-scope Combined Cycle Plant Simulator, including the accompanying 3D/Virtual version of this plant running on 3D PACT for the Maine Maritime Academy (located in Castine, Maine, USA)
_____________________________________________________________
Eskom Medupi Operator Training department aquires Samahnzi's Unit Process Simulator - April 14, 2010
Eskom Medupi Operator Training department acquires our Unit Process Simulator suite to train new operators the thermodynamic principles on which power plants are based, as well as provide trainees with a basic competence on operating a power plant via computer-based HMI screens as well as provide an understanding of the control principles and philosophies applied in a typical Fossil Power Plant.
_____________________________________________________________
Eskom acquires bulk 3D PACT licenses - April 6, 2010
Eskom places bulk 3D PACT licensing order for roll-out in its New Build Program and Generation Engineering Design Infrastructure (GEDI) project.
_____________________________________________________________
Samahnzi provides Unit Process Simulator to St Lawrence College (Ontario, Canada) - March 15, 2010
St Lawrence College (Ontario, Canada) acquires Samahnzi’s Unit Process Simulator suite to teach students the thermodynamic principles on which power plants are based in an interactive and exciting way through the colourful and dynamic HMI, as well as provide students with an understanding of the control principles and philosophies applied in a typical Fossil Power Plant.
_____________________________________________________________
Samahnzi contracted by SimGenics to deliver a full-scope high fidelity Operator Training Simulator for Black Hills Power WYGEN Unit 3 - October 02, 2009
Samahnzi contracted by SimGenics Corporation to deliver a full-scope high fidelity Operator Training Simulator for Black Hills Power WYGEN Unit 3, located in Gillette, Wyoming. The 110MW unit comprises a Babcock & Wilcox Non-Reheat Drum Boiler with Siemens Steam Turbine and is controlled through an ABB Harmony/PPB Unit- and Siemens Turbine Control Systems.
|